Share
Results 1 to 8 of 8

Thread: Project #3 from DVA: Stool for changing brakes

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Oct 2011
    Location
    Litchfield Park, AZ
    Posts
    370

    Default Project #3 from DVA: Stool for changing brakes

    I am getting tired of sitting on the ground or squatting when changing brakes or rotating the tires on my vehicles.

    I got the idea for the stool of the Miller welding forums for a cool stool.

    Materials consist of 1” 16 gage square tubing, four 4 inch 11 gage gussets and more materials to come.

    The lower portion of the stool measures 16” wide x18” long. The seat is 9”X16” and the angles were cut to allow the seat to make a stool 11” tall. The pieces were all cut on my Rage dry cut saw at a 45° angle and welded to have no open ends on the tubing. Accessible welds were ground flat with a flapper wheel for looks.

    I am still debating on either using expanded metal on the seat or using Stainless Steel sheet that will be riveted on the seat. The bottom of the stool will receive a stainless steel sheet and will be fastened by rivets and will provide a good storage location for parts when working around the house.

    Wheels will be added to the stool to provide mobility. I plan on dropping the frame off at the powder coaters at the end of the month.

    I have also included some pictures of the welds that were not accessible to the flapper wheel.

    Current time to fabricate: Cutting steel ~0.5 hr, welding and fit up ~0.75 hr, current grinding and sanding ~0.5 hr. I have about 1.5 hours of work left to finish the project. Total build time estimate when finished 3.25 hr.

    Cost to fabricate: Tubing 12 feet of tubing (scrap from another project), 4 gussets $4.00, expanded metal (scrap from another project), stainless steel sheet (estimate $25.00 from Industrial Metal Supply scrap section and about $5 to have a shop make a few cuts on their sheer), wheels will cost about $25-35 dollars and powder coating will cost about 35.00. Total estimated cost for stool is about $94-104 dollars.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	IMG_1872.jpg 
Views:	376 
Size:	134.5 KB 
ID:	3701   Click image for larger version. 

Name:	IMG_1880.jpg 
Views:	379 
Size:	144.7 KB 
ID:	3702   Click image for larger version. 

Name:	IMG_1886.jpg 
Views:	396 
Size:	144.1 KB 
ID:	3703   Click image for larger version. 

Name:	IMG_1879.jpg 
Views:	377 
Size:	128.2 KB 
ID:	3704   Click image for larger version. 

Name:	IMG_1870.jpg 
Views:	381 
Size:	144.9 KB 
ID:	3705  

    Click image for larger version. 

Name:	IMG_1878.jpg 
Views:	345 
Size:	136.6 KB 
ID:	3706   Click image for larger version. 

Name:	IMG_1881.jpg 
Views:	409 
Size:	138.7 KB 
ID:	3707   Click image for larger version. 

Name:	IMG_1869.jpg 
Views:	363 
Size:	140.5 KB 
ID:	3708   Click image for larger version. 

Name:	IMG_1867.jpg 
Views:	377 
Size:	142.6 KB 
ID:	3709  
    Last edited by DVA; 10-18-2011 at 04:25 AM. Reason: Add time and cost
    Miller 252
    PowerTig 250 EXT
    Evolution Rage 2
    48X6 inch Belt Sander w/ 9 inch Disk Sander
    ...

Similar Threads

  1. 2013 summer project #1 - Shop stool
    By youngnstudly in forum Hobyist Projects
    Replies: 5
    Last Post: 08-07-2013, 07:15 PM
  2. Changing to a gas lens what do I need.
    By PeterA in forum TIG Welding (GTAW/GTAW-P)
    Replies: 7
    Last Post: 11-09-2012, 06:56 PM
  3. Changing gas to Mig Aluminum
    By Ram48 in forum MIG Welding (GMAW/GMAW-P/FCAW)
    Replies: 5
    Last Post: 08-12-2011, 03:15 AM
  4. Project 2, Tractor Seat Stool, from Tritium
    By Tritium in forum Other Custom Fabrications
    Replies: 3
    Last Post: 06-16-2011, 07:36 PM
  5. 66 Mustang disc brakes
    By ScratchStart in forum Personal Projects (no welder required)
    Replies: 1
    Last Post: 05-09-2011, 02:03 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •